South African National Roads Agency Soc Limited (SANRAL)
🔔 Suivre cet acheteur (compte gratuit)
13avis ouverts
21avis publiés sur la plateforme
0attributions connues
—offres reçues en moyenne
Avis ouverts
- THE PERIODIC MAINTENANCE OF THE NATIONAL ROUTE N6, SECTION 7 FROM SMITHFIELD (KM 0,41) TO PARTSHOOGTE (KM 32,4) — 03/12/2026 à 11h00
- FOR THE OPERATIONS AND MAINTENANCE OF THE TOLL PLAZAS ON THE NATIONAL ROUTE N2 NORTH (Retender) (Contractor) — 04/12/2026 à 11h00
- CONSULTING ENGINEERING SERVICES FOR THE DESIGN AND CONSTRUCTION SUPERVISION OF PEDESTRIAN AND PUBLIC TRANSPORT FACILITIES, INCLUDING ROAD SAFETY IMPROVEMENTS ON NATIONAL ROUTE 2, SECTION 22X, FROM KM 0.00 TO KM… — 04/12/2026 à 12h00
- FOR CONSULTING ENGINEERING SERVICES FOR THE COMMUNITY DEVELOPMENT PROJECT (CD) FOR R573-010-2023/1 UPGRADE OF KLOPPERSBOS/PYRAMID ROAD FROM GRAVEL TO SURFACED — 08/12/2026 à 10h00
- APPOINTMENT OF A SERVICE PROVIDER FOR THE PROVISION OF CONTENT GENERATION, DESIGN, LAYOUT, PRINTING AND DISTRIBUTION SERVICES FOR A PERIOD OF THREE [3] YEARS. — 08/12/2026 à 11h00
- PROVISION OF ROUTINE ROAD MAINTENANCE CONSTRUCTION SERVICES FOR THE PROJECTS IN THE NORTHERN CAPE PROVINCE — 08/12/2026 à 12h00
- FOR THE OPERATIONS AND MAINTENANCE OF MARIANNHILL TOLL PLAZA ON NATIONAL ROUTE 3 (Contractor) — 08/12/2026 à 12h00
- FOR CONSULTING ENGINEERING SERVICES FOR THE INSTALLATION OF STREET LIGHTING ON NATIONAL ROUTE N1 SECTION 27 KM 3.0 TO KM 16.40 IN POLOKWANE UNDER LIMPOPO PROVINCE — 10/12/2026 à 12h00
- APPOINTMENT OF A SERVICE PROVIDER FOR THE PROVISION OF SECURITY SERVICES AT SANRAL WESTERN CAPE PROVINCIAL OFFICE FOR A PERIOD OF 36 MONTHS — 11/12/2026 à 12h00
- FOR THE RESURFACING ON NATIONAL ROUTE R104 SECTION 1 FROM SOLOMON MAHLANGU (KM 20.0) TO BRONKHOSTSPRUIT (KM 58.01) — 22/01/2027 à 12h00
- FOR THE CONSTRUCTION OF THE BRIDGE OVER RAIL ON DR MOROKA ROAD IN RUSTENBURG — 27/01/2027 à 12h00
- THE IMPROVEMENT OF NATIONAL ROUTE 2 SECTION 1 BETWEEN SWARTKLIP (KM 17.47) AND EAST OF BADEN POWELL INTERCHANGE (KM 29.00) — 05/02/2027 à 12h00
- THE CAPACITY IMPROVEMENT OF NATIONAL ROUTE 1 SECTION 1 FROM OLD OAK INTERCHANGE (KM 18.90) TO KOELENHOF INTERCHANGE (KM 33.00) — 12/02/2027 à 12h00
Montants, historique complet et analyse de la concurrence : réservés aux abonnés (à partir de la formule Starter). Créer un compte